Fiber Analysis in Oklahoma
In order to attach new aerial fiber optic cable, CEC performed a full analysis of 5,254 poles in 27 separate task orders for Dobson Fiber in Enid, OK.
This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning. CEC completed pole loading analysis and vertical clearance analysis of all poles based off LiDAR and field collected data using commercially available software. Our team delivered a design packet, construction material list, and construction cost estimate for each of the 27 work orders.
CEC’s design packets encompassed Dobson’s proposed fiber route and any pole replacements (make-ready work) necessary due to failed loading or clearance analysis. Our team also staked the projects for construction, marking all pole replacements and new pole locations.
Location
Enid, OK
Services
Broadband Engineering, Power Distribution Design, Remote Sensing
Contact for More InformationPole Loading Analysis in Texas
Our team performed Pole Loading Analysis on 1200 Xcel Energy poles in Texas.
More DetailsMake-Ready Engineering for Bluepeak Fiber
In order to attach to new aerial fiber optic cable, CEC performed a full analysis of 5,695 poles in 29 separate work orders.
More DetailsCity Of Richardson 30-Inch Waterline
CEC provided Quality Level B Designating and Quality Level A Test Holes for the City of Richardson.
More Details