Fixico-Kolache River Crossing
CEC discovered washed out structures along the Canadian River during inspection of the line through a Transmission Restoration project. CEC and OG&E worked together to evaluate multiple options for relocation of the line. Details considered in making the decision included timeframe, ROW issues, environmental considerations, FAA restrictions, and the desire to eliminate any structures being placed in the riverbed. After R/W discussions fell through, CEC and OG&E decided the best solution was to stay in existing R/W and span the entire riverbed.
CEC evaluated many options and decided to utilize Aluminum Alloy Conductor Steel Reinforced (AACSR) for the long span crossing. By using AACSR, the design was able to use structures shorter than 200’ which kept the design under the requirements for FAA permitting, painting and lighting. The final solution called for 155’ and 165’ structures and a 2,551’ span.
Location
Oklahoma City, Oklahoma
Services
Land Survey, Power Transmission Design, Remote Sensing, Structural Engineering
Contact for More InformationTribune Media KFOR News Studio
Located on the same property as their existing broadcast facility, the new facility is a stand-alone, single story building approximately 8,000 square feet in size.
More DetailsPole Loading Analysis in Texas
Our team performed Pole Loading Analysis on 1200 Xcel Energy poles in Texas.
More DetailsFiber Analysis in Oklahoma
This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning.