CEC worked with Oklahoma Gas & Electric (OG&E) to assess and restore the 38-mile Seminole-Ashland 345kV H-Frame Transmission Line. This project included physical field inspection of 540 transmission structures. CEC crews carefully assessed each structure, including the structural analysis of each pole, and piece of equipment. Through their analysis, CEC determined the best solution for each structure whether it be repair, reinforcement, or replacement. CEC’s design incorporated OG&E’s construction standards and in-stock material. CEC created and/or updated drawings and PLS-CADD models to show each design solution. The material was entered in OG&E’s material management software where CEC developed a complete project cost estimate. Challenges for this line included:
-
- Traversing the T-line terrain while inspecting
-
- Researching material to fit static wire and bundled conductor with armor rods not common with their standards
Location
Seminole, Oklahoma
Services
Land Survey, Power Transmission Design, Remote Sensing
Contact for More InformationPole Loading Analysis in Texas
Our team performed Pole Loading Analysis on 1200 Xcel Energy poles in Texas.
More DetailsFiber Analysis in Oklahoma
This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning.
More DetailsCity Of Richardson 30-Inch Waterline
CEC provided Quality Level B Designating and Quality Level A Test Holes for the City of Richardson.
More Details