US-270 Widening
The corridor was split into several construction projects. The first project begins north of the town of Seiling at the US-270/US-183 junction and proceeds southerly approximately 3.5 miles through the town of Seiling. This was a turn key project to widen US-270 from 2 lanes to 4 lanes with several constraints and challenges in Seiling. The bridge over Seiling Creek was widened symmetrically to accommodate 4 lanes of traffic.
The second project was an additional 1.5 miles of 4 lane undivided construction to the south of Seiling. This project also included a symmetric widening of the bridge over Cheyenne Creek.
The last 4 miles consisted of a 4 lane divided facility with improvements to the existing lanes to accomplish needed safety improvements.
Location
Seiling, Oklahoma
Services
Roadway Engineering, Streets and Stormwater, Traffic Engineering
Contact for More InformationMercy I-35 Primary Care Clinic
Mercy has expanded care in the Edmond, Oklahoma area with this comprehensive Primary Care Facility.
More Details8-Inch and 18-Inch Waterline
CEC provided design services for the widening of the intersection at 2nd Street and Bryant Avenue.
More DetailsHospital Area Water Lines
CEC provided design services associated with developing construction documents for the replacement of multiple waterlines in the hospital area.
More Details