8-Inch and 18-Inch Waterline
CEC was selected by the City of Edmond to provide design services for the widening of the intersection at 2nd Street and Bryant Avenue. As part of this project, the waterline needed to be relocated in order to widen the roadway along both 2nd Street and Bryant Avenue. CEC performed the design of approximately 1,600 feet of 8” D.I.P. waterline along 2nd Street and the relocation and upgrade of approximately 1,900 feet of 18” D.I.P. waterline.
Location
Edmond, Oklahoma
Services
Civil Engineering, Land Survey, Remote Sensing, Streets and Stormwater, Traffic Engineering, Water Distribution and Wastewater Collection
Contact for More InformationPole Loading Analysis in Texas
Our team performed Pole Loading Analysis on 1200 Xcel Energy poles in Texas.
More DetailsFiber Analysis in Oklahoma
This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning.
More DetailsCity Of Richardson 30-Inch Waterline
CEC provided Quality Level B Designating and Quality Level A Test Holes for the City of Richardson.
More Details