23rd Street Waterline
The project consisted of replacing 2,800 linear feet of 16-inch waterline, multiple service line connections, fire hydrants, all associated valves and more
Read MoreUS-69 Calera
One of the largest projects in Oklahoma, US-69 is an example of visualization used at every stage of the project, from project bidding to the public meeting and onward into construction.
Read MoreRockwell Heights
Rockwell Heights contracted the team at CEC to help show how potential buyers might be able to use the lots.
Read MoreI-40 Exit 82 Weatherford
This project created space for 12 additional based airplanes, to be housed in modern, well-lit hangars with hydraulically operated motorized doors.
Read MoreSchool Safety Improvements
CEC provided design plans for sidewalk and ramp improvements to meet ADA requirements and improve safety for 22 schools in the Tulsa area.
Read MoreBryant Avenue Intersection
The purpose of the project was to increase the capacity and improve traffic flow at one of the City of Edmond’s busiest intersections.
Read MoreI-40 Exit Ramp and Main Street
CEC contracted with the City of Weatherford to provide design services for the redesign of an exit/entrance ramp and roadway improvements.
Read More700 West Apartments and Garage: The Muse
CEC provided structural engineering for this 5-story, 260,000 total SF apartment complex with an adjoining 4-story, 120,000 total SF parking garage.
Read MoreOwasso Redbud Festival Park
CEC provided civil, structural, and MEP design for the construction of a centerpiece downtown park.
Read MoreThe Flats On Archer
This facility includes a rooftop entertaining space, meeting space, business center, as well as a multi-level fitness studio.
Read More