Olive Avenue Widening
The project included the reconstruction of approximately one mile of arterial roadway to widen the existing 2-lane open section roadway to a 5-lane roadway with curb and gutter.
Read MoreSH-9 Cleveland County
Design services provided by CEC included the NEPA Clearance, including a public meeting, and roadway and bridge design plans for this project.
Read MoreUAS LiDAR Transmission Line River Crossing
Utilizing a rotorcraft UAS, the data was acquired “low and slow” in order to capture a high point density.
Read MoreTerrestrial LiDAR Historical Documentation
CEC was contracted to provide 3D laser scanning services to support restoration efforts for the Warden’s House, located in McAlester, OK.
Read MoreSeminole-Ashland Restoration
CEC assessed and restored a 38-mile transmission line, which included physical field inspection of 540 transmission structures.
Read MorePark Community-Kingfisher
Our team worked on an accelerated timeline and expedited design according to RUS and WFEC standards
Read MoreFixico-Kolache River Crossing
CEC discovered washed out structures during a restoration project, and worked to evaluate multiple options for relocation of the line.
Read MoreLoafman Substation
CEC was responsible for the site design, including drainage, earthwork and driveways. We coordinated with WFEC, REC, and Enerfin Energy to complete the design.
Read MoreAmber Substation
An accelerated schedule, drainage issues and plans for future expansion made this project both challenging and rewarding for our Power Delivery team and project partners
Read MoreEastern Substation Transformer Replacement
CEC produced construction drawings, prepared bids and specifications, and reviewed contractor bids and made recommendations to the City of Edmond.
Read More