{"id":1164,"date":"2021-09-17T15:26:42","date_gmt":"2021-09-17T20:26:42","guid":{"rendered":"https:\/\/connectcec.flywheelsites.com\/?page_id=1164"},"modified":"2024-05-29T13:18:09","modified_gmt":"2024-05-29T18:18:09","slug":"water-distribution-and-wastewater-collection","status":"publish","type":"services","link":"https:\/\/www.connectcec.com\/services\/water-distribution-and-wastewater-collection\/","title":{"rendered":"Water Distribution and Wastewater Collection"},"content":{"rendered":"\n
\"\"<\/figure>\n\n\n\n

Water Distribution and Wastewater Collection<\/h2>\n\n\n\n
\n
\n

A minimal portion of the water on earth is drinkable, yet it replenishes all life. As the planet\u2019s population continues to surge upward, our commitment to dutifully manage this most precious resource must follow. From collection to treatment to distribution to reuse, the employment of efficient and dependable systems will allow for life\u2019s continual renewal.<\/p>\n<\/div>\n\n\n\n

\n
\n
Contact Us<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n

Featured Projects<\/h3>\n\n\n\n
\n
\n
\"\"<\/a><\/figure>\n\n\n\n

23rd Street Waterline<\/a><\/h4>\n\n\n\n

The project consisted of replacing 2,800 linear feet of 16-inch waterline, multiple service line connections, fire hydrants, all associated valves and more. Learn More \u2192<\/strong><\/a><\/span><\/p>\n<\/div>\n\n\n\n

\n
\"\"<\/a><\/figure>\n\n\n\n

Hospital Area Water Lines<\/a><\/h4>\n\n\n\n

CEC provided design services associated with developing construction documents for the replacement of multiple waterlines in the hospital area. Learn More \u2192<\/strong><\/a><\/span><\/p>\n<\/div>\n\n\n\n

\n
\"\"<\/a><\/figure>\n\n\n\n

8-Inch and 18-Inch Waterline<\/a><\/h4>\n\n\n\n

CEC provided design services for the widening of the intersection at 2nd Street and Bryant Avenue. Learn More \u2192<\/strong><\/a><\/span><\/p>\n<\/div>\n<\/div>\n\n\n\n

Our Services<\/h3>\n\n\n\n
\n
\n

Water Distribution<\/strong><\/p>\n\n\n

\n